inspection went good. only a few things to address. the sellers don't have a place to go yet, and our lease ends in july so it kind of works that the closing date is at the end of june. here are a couple pics of the garage. it was hard to get decent ones cause they had so much stuff inside it. it has vaulted ceilings on the single door side, high enough that a lift could be installed. on the big door side, there is a nice attic storage area with pull down ladder. there are a ton of cabinets that are staying which is also nice. the only thing that i would add to the garage is 220V and an air compressor