Jump to content

Quadtrails


Recommended Posts

  • Replies 107
  • Created
  • Last Reply

Top Posters In This Topic

I'm 5'11" I did not hit my head when I checked for head room.

All LKQ u-pull-its are 1/2 price this weekend and I scored big time. I found a 91 four door xj that still had the key in the lock. So at the first yard I got both complete doors with glass, mirrors, and all interior parts, xj proportioning valve, and an xj dome light with map lights to go in the sound bar. All for $86, then We went to another one and I got a dual diaphragm brake booster from a 1998 zj for $11.

Link to comment
Share on other sites

  • 2 weeks later...

I got my axls out of the shop. I bought new trail master u-bolts and rubicon express center pins for the leafs. I used chevy u-bolt plates. I now have a dana 60 permanently installed in my truck. I installed my new doors. I modified the hinges so that they can be removed quickly. I am going to make 1/2 doors out off my old doors. I was able to drive my comanche today!!! now it is time to start on the front end. I am talking to a guy about picking up my front 8 lug hp 44.

Link to comment
Share on other sites

picked up my front axle today. The directions were: head toward amboy go about 15-20 minits, look for the scrapped out travel trailer and mud pits :hmm: Anyways, got a hp Dana 44 warn hubs, 4.10's, the big, 8 lug hubs, and radius arms. Time to tare down the front end. :banana:

Link to comment
Share on other sites

Got the front end all torn apart. Put rollers on the 44. Found out it uses 9/16 lug nuts. $2.75 a piece at shucks. 44 has a seized caliper, or at least rusted shut. I snaped a new grade 8 bolt right off so I called it quits for the night. I will deal with that tomorrow. Spent all day today running around for hardware.

Link to comment
Share on other sites

  • 1 month later...

Built my tierod, 3/4" heims and 1 1/2" 1/4 wall dom. Got one of my radius arms on realized that the two original arms that I bought had stripped bolt holes. So off to u-pull-it tomorrow.

Link to comment
Share on other sites

Today was a productive mj day. I figured out that I will have to run a 5/8 bolt to compensate for misalignment spacers on the drag link, so I got new grade 8 hardware, I also had to get new radius arms because the ones that I got with the axle had bad treads. So, I got both radius arms assembled on the axle, then I cut off the LCA mounts and got my radius arm mounts tacked up. jamminz.gif Got my tierod installed. Drank beer image_209027.gifimage_209027.gif

 

Link to comment
Share on other sites

  • 2 weeks later...

I removed the trackbar mount and steering box to prepare the unibody for plating. I made a template out of cardboard that I will trace onto the plate.

Link to comment
Share on other sites

I am working out a couple issues right now, I am trying to figure out how I want to build my crossmsmber. I think that I need to move my radius arms in more, I will take some pics tomorrow. I just ordered my frame side and axle side mounts for the trackbar from ballistic fabrication. I have been going pretty slow lately, my subi has been costing me a lot of money lately, I just had to put a new windshield in.

Link to comment
Share on other sites

  • 2 weeks later...

Here are some pics of my radius arm mounts so far. I mocked them up measured, tacked and now have the burned in. Figured that i would post some pics while I'm waiting for metal to cool.

 

 

Now back to burning in the frame mounts.

Link to comment
Share on other sites

I used poly mounts at the spear end with no apparent ill effects, but the poly C-bushings sucked. They just did not allow for any flex. If you find a source for new rubber C-bushings, let me know. Back in the day I couldn't find anything (although I really haven't looked for them recently).

Link to comment
Share on other sites

Yes, frame mount, axle mount and the heims for the trackbar from Ballistic. Now I have to plate the front of my frame so I can weld on the trackbar mount.

Link to comment
Share on other sites

I was able to start on my frame plating today. Here's what I was able to get done today between helping eric trim and weld up his bumper.

 

I started out by making a template out of cardboard.

 

Then i cut out the first part with a cut off wheel. I used the drill press to drill the holes for the steering box.

 

Next I drilled about 30 holes for plug welds and then bolted the plate in place with the steering box bolts.

 

After that I filled all the plug welds and welded the two ends.

 

 

Now on the the rear.... BTW I am using 1/8" plate and I was able to get the steel to bend around the curves in the frame with a c-clamp.

 

There is much more to come tomorrow. I am going to weld the entire perimeter of the plating. I will go farther back later. There are 75 plug welds to be exact.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


×
×
  • Create New...