Jump to content

Recommended Posts

Posted

And then finished up the floor pan and set it in place to mark where to clean up for welds. Oh and the seatbelt brace too.

20260823_191815.jpg.63957a6acb02f07e906371c164cb9628.jpg

And thats where I leave things for tonight. 

20260823_195342.jpg.980e46c2e8d8b5149f06015e3fdfa3c6.jpg

  • Replies 136
  • Created
  • Last Reply

Top Posters In This Topic

Posted
11 hours ago, A-man930 said:

I love it.  Sorry if you've mentioned it already, but what is the supercharger you're going with?  

The supercharger is a fageol supercharger. 

Posted
15 hours ago, The86manche said:

Knocked that out real quick.

20260823_174442.jpg.602fbdaf6ced651844e347ac44e3c4a6.jpg

 

20260823_181607.jpg.3767b2edc910bb03f8cb60f76a33b793.jpg

20260823_182529.jpg.fa7bd177f6352c77feb08a403d784a12.jpg

Just a heads up, I would also get the rest of the seam sealer off of your firewall to check underneath. Almost all of the seam sealer on my truck was hiding rust and rot. Might be easier to do it now that you're already doing the floors. And if there's no rust you have the peace of mind

Posted
3 hours ago, coheed said:

Just a heads up, I would also get the rest of the seam sealer off of your firewall to check underneath. Almost all of the seam sealer on my truck was hiding rust and rot. Might be easier to do it now that you're already doing the floors. And if there's no rust you have the peace of mind

 

I was thinking the same thing. 

Posted
6 hours ago, coheed said:

Just a heads up, I would also get the rest of the seam sealer off of your firewall to check underneath. Almost all of the seam sealer on my truck was hiding rust and rot. Might be easier to do it now that you're already doing the floors. And if there's no rust you have the peace of mind

Yeah i know you're right. I just don't want to rip down ALL that thick seam sealer lol.. such a mess and a hassle.

But I will.

The plan will be I will weld in the new floor pan and then rip doen the seam sealer. Just so I can keep the crap out of the unibody rail, cause I'm tired of cleaning that out too haha

Posted
15 hours ago, The86manche said:

Yeah i know you're right. I just don't want to rip down ALL that thick seam sealer lol.. such a mess and a hassle.

But I will.

The plan will be I will weld in the new floor pan and then rip doen the seam sealer. Just so I can keep the crap out of the unibody rail, cause I'm tired of cleaning that out too haha

Totally understand that lol. I feel like I cleaned out my frame rails multiple times because I didn't think about that ahead of time. 

Posted

So much closer to the floor being a permanent feature! 

Spent tonight wrapping up small jobs that needed to get done.

Seat belt brace!

20260825_183049.jpg.f50efe7ac03003eb42f633cbbca0a292.jpg

Burned in both ends. I was not impressed with amcs quality here. The brace is only welded to the floor. So I added a few tacs to the unibody for a more solid and permanent fit.

20260825_184301.jpg.bccb07d2750d4524574891fbb40e85cb.jpg

Previous owner had put an online fuel pump in the truck way back when the 2.8 died and put in a 3.4. It worked. But also looked like he went through several online pumps over the years. And left several holes. Didn't need to weld them up because they were blasted and epoxied but I wasn't a fan of them. Cleaned. Filled. Ground. And touched up.. no wonder this project is taking so long... :shaking:

20260825_191905.jpg.c2621441d11edd55489e92ea777ab6e0.jpg

Final touches here. Sanded. Cleaned. And black enamel. If this truck ever rusts again.. it won't be in my lifetime.

20260825_195344.jpg.bcc333a1dc603a7ef4460891327abda6.jpg

From here, ive got some seam seal to scrape. Some spots to clean for weld. And a few spots to address on the floor pan and then its getting welded in. Hopefully this week.

Posted

Would you just look at it!

20260826_211511.jpg.fb435cdf828707aff418c412d78e1dd0.jpg

The key parts full floor section was a pretty damn good fit. There were a few areas that needed some persuasion but we got it there.

All in all.. 10/10 would buy again. key parts floors are pretty damn good.

Posted

And some more motivation!20260826_212405.jpg.73bfa7a1df076ea1d75f309d454df10e.jpg

I am so not looking forward to all the grinding I'm going to have to do.

I also still need to weld around the trans tunnel but i cut a spot a little short so i may have to trim more and make a patch.

the floor brace will be going to work tomorrow so i can epoxy it and from there... more drilling.. 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...