yea i gotta get the resto mj done sometime . and that chevy needs abit of frame plating and a floor patch or 2 , one ball joint, rear brakes, and breaklines all the way around. not to mention either rebuilding the trnny thats in it or getting a new one/ swapping a 5 speed. then maby its 350 time :brows: