Jump to content

MJ shed, Part Deux.


Automan2164
 Share

Recommended Posts

Well, Its finally happened, again. Back when I was living with ma and her 1 car garage, I had taken over her garage with my amassed collection of MJ parts. She was nice enough to buy me a 10 x 10 shed to get her garage back, which meant I had a shed AND a garage to fill with stuff. :yes: After selling off the whole lot, MJ's and all when I moved out, she had all the space to herself again. Now at my new place I had a 2 car garage to fill, and installed an attic ladder in the garage, so I had enough to get me by. But, the "big" items started to take up valuable real estate in the garage. I/E, the Factory plow, the long and short bed roll bars, tires, wheels, engines, trannys... Ugh.

 

So I was on the hunt for a new shed. I set myself a goal of $500, and took a liking to the "Composite" sheds. (Vinyl.) Being that they were about $850 without floor, I hit up the local CL. Ended up finding an 10 x 7.5 Suncast, with floor for $550. Took my trailer, a buddy, and some tools up to get it. Quickly realized that this was a one time shed. Everything snapped together. After about 2 hours of fumbling with flat head screwdrivers and snap tabs in the dark, it was loaded up. Trailer came loose on the way home, but no big deal... Little damage, but all in all ok.

 

Had to replace some lumber and plywood, but got the foundation leveled off on split faced cinder blocks, and anchored down with some drill in anchors and u-bolts...

 

69474_153071071397055_100000824882082_233875_3432860_n.jpg

 

36087_153071281397034_100000824882082_233878_2233942_n.jpg

 

39529_153071474730348_100000824882082_233880_7024216_n.jpg

 

It literally had no screws besides some to hold the flooring together. I just substituted all those with wood screws and fender washers to keep the shed firm to the foundation.

 

66292_153071598063669_100000824882082_233882_800634_n.jpg

 

Once the floor was done, it took me and the girlfriend about 25 minutes to put the shed up.

 

65895_153071711396991_100000824882082_233883_4918274_n.jpg

 

68492_153071804730315_100000824882082_233885_2255291_n.jpg

 

The peak of the roof had these white ridge pieces that got brittle and cracked, so I stumbled onto this piece of clearance pole barn panel that was a perfect color. Even had a ridge bent into it already. Some brown pole barn screws, silicone caulk, and we were in business. Just had to tin-snip off the extra.

 

40869_153251284712367_100000824882082_234633_4924239_n.jpg

 

33555_153251481379014_100000824882082_234635_5387875_n.jpg

 

33776_153251704712325_100000824882082_234637_1302468_n.jpg

 

33649_153251048045724_100000824882082_234625_7208600_n.jpg

 

All in all, I think I am about $650 into it. With a new one costing $850 plus all the wood, and materials, I am pretty pleased. I have a solar spot light I'm going to toss up on the end so I can keep an eye on it at night and I am done. Its pretty solid, and better than those cheapo tin sheds. Pretty cool that it matches the house color too.

 

TIME TO FILL IT UP!

Rob L. :cheers:

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...