Bonkers Posted October 31, 2006 Share Posted October 31, 2006 Okay, I rolled Carmine into the back of my garage last night and began prep work on the quasi-resto. I have a lot to accomplish in a short time so hopefully it won't be too interesting. First pic: Her temp home. As you can see I already have the 31" tires on so the first thing that will need to be done is to swap out for the Grand Chero Control arms. Next on my list is a full engine and Ax15 swap. Here is the before pic of what will be removed. During the teardown I will try to starighten out the frame in the front corner. Right now the bumper is about 3 inches farther back under the fenders than should be. The big project will be the interior - its all coming out. I have two floorpans, power windows, window seals, radio, and new shifter knob. As you can see from this pic I still have a nasty leak from somewhere that needs to be addressed. Hopefully the project won't take very long, but I am going to try my best to document it. Link to comment Share on other sites More sharing options...
fiatslug87 Posted May 30 Share Posted May 30 Try harder. Link to comment Share on other sites More sharing options...
Drahcir495 Posted August 30 Share Posted August 30 Dang it - the pictures don't work for me Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now