Got side tracked but here is the status, Boggers got sold and oredered a new set of 39.5x16.5x17 Pitbull Rockers. BallisticFabrication weld on beadlock rings are on the way. Front bracketry almost finished and close to being welded on, new brake rotors, pads and 4 studs to replace the missing ones. Rear perches, 3.5" u-bolts and .5" spring top plates are here and ready to go on. Tires are getting mounted on new rims tomorrow, also got a PSC pump kit here already with pump, reservoir, hoses and a derale cooler. Tomorrow ordering a PSC 1.75"x 8" assist cylinder with hose kit and the complete box rebuild kit will be at advance auto tomorrow. I also scored some MJ buckets with MJ center console so I'll have the seats recovered and ready to bolt into the new floor in the next few weeks. Interior will be pretty "pimpin" when it's all done but more about that as it comes together.